Your electricity bill is ₹4 - 6 lakh a month. That is not a fixed cost — it is your biggest controllable lever. Most factories have never pulled it.

Three Ways We Work With You
Which One Is You?
Swami Vessels Pvt. Ltd. builds for three different customers, and the engineering standard doesn’t change between them; but the numbers, the process, and the paperwork do.
01
Residential For Your Home
PM Surya Ghar subsidy up to ₹78,000. EMI-friendly. Sized for your roof, not a factory-scale system. → Explore Residential Solar
02
Commercial For your business
Shops, offices, warehouses. Net metering and tax treatment handled properly, not left to guesswork. → Explore Commercial Solar
03
Industrial For your factory
Engineering-led EPC – structural assessment, DPR, 25 – year warranty. Built for facilities that can’t afford a mistake on the roof. → Explore Industrial Solar
The Problem We Solve
Electricity is the
Bill Nobody Questions.
🔬
Graduate-Level Solar Science
Founder Himanshu Ingale holds an MS in Mechanical Engineering from the University of Cincinnati, Ohio. His published research proved nano-scale surface engineering increases solar cell efficiency by 10%+. Panels are specified by science, not by commission.
📋
Complete Transparent Documentation
Every cable run, structure calculation, DISCOM submission, service log — fully documented, handed to you. A plant you understand is a plant you can protect for 25 years. No black boxes.
🏗️
150 km/hr Wind-Rated Structures
Every structure is engineered — not guessed. Hot-dip galvanized, designed for Maharashtra's monsoon winds. Platforms, cable trays, earthing — built like it matters, because it does for 25 years.
📡
Real-Time Monitoring, 25 Years
Remote plant monitoring plus quarterly physical inspections and a formal AMC program. We answer our phone. We fix our problems. Not just at commissioning — for the lifetime of your plant.
🏦
Loan Documentation Support
MSME term loans from SBI, Bank of Maharashtra, Bank of Baroda, Jalgaon Janata Sahakari Bank. We prepare your project report and feasibility documentation for loan sanction.
⚠️
Safety. Always. Non-Negotiable.
Zero accidents across every project. Helmets. Harnesses. Lock-out/tag-out procedures. Every subcontractor trained before first day on site. This is not a slogan. It is our record.
HI
Founder & Chief Engineer
Himanshu Ingale
The Engineer Behind It
Built in a Factory.
Perfected in Ohio.
“I built SVPL Solar because I grew up watching Maharashtra’s factory owners pay extortionate electricity bills while substandard solar installers gave them a worse deal than the grid. That ends here.”
MS Mechanical Engineering, University of Cincinnati, Ohio. Published research on nano-scale surface engineering for solar cell efficiency improvement. Born in Maharashtra. Trained in American engineering rigour. Back to build it right.
MS Mechanical Engg
University of Cincinnati · Ohio
Solar Research Published
MSEDCL Certified EPC
25-Year Commitment
5
MW+ Installed
0
Accidents. Ever.
25
Year Responsibility
150
km/hr Wind Rating
Industries We Serve
Factories We Understand.
Problems We've Solved.
We don’t do residential. We serve industrial and commercial consumers who understand that a solar plant is a capital investment — not a cheap fix.
🧵
🧵
Textile & Spinning
High 24×7 baseload, power-loom clusters, Vidarbha cotton ginning
Save ₹40 - 80L / Year
🧊
🧊
Cold Storage
Compressor load dominates bills. Solar cuts peak MD charges by 30 – 40%
Save ₹15 - 35L / Year
🌾
🌾
Food Processing
Day-shift dominated load profiles — ideal solar match
Save ₹20 - 50L / Year
🔩
🔩
Auto-Ancillary
Nashik cluster, pressing, machining, fabrication plants
Save ₹25 - 55L / Year
⚙️
⚙️
Engineering Works
CNC, welding, heat treatment, fabrication — heavy industrial
Save ₹18 - 40L / Year
How We Work
Six Phases.
Zero Surprises.
Every SVPL project follows the same documented process — so you know what happens, when, and why. No hidden steps. No post-signature shocks.
01
Free Energy Audit
We analyse your last 12 MSEDCL bills — not an estimate, your actual tariff slab, MD charges, time-of-day pattern and load factor. We calculate your real effective cost per unit including all surcharges.
02
Structural & Shadow Assessment
Every roof assessed — age, material, purlin spacing, load-bearing capacity, shadow obstructions. Any EPC that quotes without this is cutting corners. We never do.
03
Detailed Project Report
Full DPR with panel layouts, generation estimates (PVSyst), structure drawings, single-line diagrams, DISCOM application ready. Bankable for SBI and Bank of Maharashtra MSME loans.
04
Engineering-Grade Installation
Hot-dip galvanized structures. Tier-1 panels — Waaree, Adani Solar, Vikram Solar. Cable sizing by calculation, not guess. Every earthing point tested. Zero shortcut installation.
05
MSEDCL Net Metering & DISCOM
We manage the complete net metering process end-to-end — DPR, application, follow-up, inspection, and meter installation. Jalgaon/Nashik: 8 – 12 weeks. Aurangabad/Nagpur: 10 – 16 weeks.
06
25-Year AMC & Remote Monitoring
Remote monitoring. Quarterly site visits. Formal AMC available. We answer our phone at year 7, year 15, year 22. Because a 25-year responsibility is not just a commissioning certificate.
Results That Hold
Real Plants.
Documented Numbers.
1.1MW
Textile · Jalgaon
Spinning Mill — 100 TPD Capacity, Jalgaon District
1.1MW
System Size
₹72L
Annual Saving
4.8yr
Payback
HT consumer on 11 kV supply. Pre-solar effective unit cost: ₹10.40/unit including MD charges and fuel surcharge. Post-solar: ₹2.80/unit blended. 150 km/hr wind-rated ground-mount structure. Zero accidents during 14-week installation.
480kW
Cold Storage · Nashik
Multi-Chamber Cold Storage, Nashik — Agri & Pharma
480kW
System Size
₹28L
Annual Saving
5.2yr
Payback
LT agricultural cold storage. Challenge: compressor start surge and MD peaking. Solution: Solar array timed to offset morning MD demand charge window. MD penalty reduced by 38%. Net metering sanctioned in 10 weeks through Nashik MSEDCL.
620kW
Auto-Ancillary · Aurangabad
Auto-Component Pressing Plant, Aurangabad Industrial Belt
620kW
System Size
₹44L
Annual Saving
5.6yr
Payback
Three-shift production, high night demand. Solar covers 62% of total consumption. Structured on pre-engineered factory sheeting roof, age 14 years — required full structural load audit before design. Audit revealed two purlins requiring reinforcement. Fixed before panel installation. No compromise.
What Factory Owners Say
The Proof Is
In Their Bills.
★★★★★
“Three EPCs quoted cheaper. SVPL Solar quoted right. After two monsoons, our structure hasn't moved a millimetre. The three cheap structures in the same MIDC failed in the first storm.”
RJ
Rajesh Joshi
MD · Jalgaon Spinning Mills
★★★★★
“Himanshu answered my phone call 14 months after commissioning — at 8 PM on a Saturday — because our inverter threw an error. That does not happen with other solar contractors.”
PK
Prakash Kulkarni
Owner · Nashik Cold Chain Pvt Ltd
★★★★★
“They told us our roof needed reinforcement before installing panels. Every other EPC said the roof was fine. They were right. We fixed it. Our plant is now 4 years old and generating exactly what they projected.”
VM
Vilas Mahajan
Director · Aurangabad Auto Components
Industry Savings Data
What Your Industry
Typically Saves.
Every number below is based on actual MSEDCL tariff slabs, real load profiles from client energy audits, and conservative generation estimates — not marketing projections.
Industry
Monthly Units
Annual Saving
Payback
MSEDCL Tariff
Textile & Spinning Mill
1,00,000 – 2,50,000
₹40 – 80L
4 – 5.5 yr
HT-1 / LT-III
Food Processing Plant
50,000 – 1,20,000
₹20 – 50L
4.5 – 6 yr
LT-III / HT-1
Cold Storage & Ice Plant
40,000 – 90,000
₹15 – 35L
5 – 6.5 yr
LT-III / HT-1
Auto-Ancillary / Pressing
60,000 – 1,50,000
₹25 – 55L
4.5 – 6 yr
HT-1 / LT-III
Cotton Ginning
30,000 – 80,000
₹12 – 28L
5 – 6 yr
LT-III
Engineering Works / CNC
40,000 – 1,00,000
₹18 – 40L
4.5 – 5.5 yr
LT-III / HT-1
Service Regions
Maharashtra.
Every District.
MSEDCL approval timelines, local DISCOM contacts, and ground teams — we know the process in every region we serve. No excuses about bureaucracy. We navigate it for you.
Jalgaon
Home Region
- Textile & spinning mills
- Cotton ginning units
- Food processing
- Engineering works
MSEDCL Net Metering
8 - 12 weeks
Nashik
Industrial Belt
- Auto-ancillary cluster
- Cold storage & agri
- Wine & food processing
- Engineering plants
MSEDCL Net Metering
8 - 12 weeks
Aurangabad
Auto-Ancillary Hub
- Automotive component plants
- Pharma manufacturing
- Textile processing
- Engineering MIDC
MSEDCL Net Metering
10 - 16 weeks
Nagpur
Vidarbha Capital
- Cotton & agri processing
- Power-intensive industries
- MIHAN zone units
- Engineering sector
MSEDCL Net Metering
10 - 16 weeks
Mumbai
Commercial & Suburban
- Commercial complexes
- Industrial Thane/Bhiwandi
- Cold chains & logistics
- Manufacturing Navi Mumbai
MSEDCL Net Metering
14 - 20 weeks
Frequently Asked
Questions Factories Ask Before Saying Yes.
We answer the hard questions first. Not after you sign.
Free Resources
Education First.
Sales Second.
We write what factory owners actually need to know — not what sounds good in a brochure.
Electricity Costs
What Your MSEDCL Bill Actually Costs Per Unit — After All Hidden Charges
Most owners know their monthly total. Few know their real effective rate after fixed charges, MD charges, fuel adjustment, power factor penalty, and taxes. This changes your payback calculation dramatically.
8 min read
EPC Selection Guide
10 Questions to Ask Before Signing a Solar EPC Contract in Maharashtra
The wrong EPC costs you crores over 25 years. These 10 questions — asked before signing — will reveal everything you need to know about whether an EPC can be trusted with your capital expenditure.
7 min read
Technical
Solar Panel Degradation — What It Means for Your 25-Year Return on Investment
Cheap panels degrade at 1.5 – 2%/year vs 0.5% for quality Tier-1 panels. Over 25 years, that gap is enormous — equivalent to losing 6 – 7 years of generation. The numbers are in this article.
9 min read
TAKE THE FIRST STEP
What Would You Do
With
₹50 Lakh
Extra Per Year?
Most factory owners we speak to have never run the real numbers. We run them honestly — with your actual tariff slab, your actual load profile, and a conservative payback projection. No hype. No pressure. No obligation.
Free · No obligation · Response within 24 hours